TABLE OF CONTENTS Page
|
1.0 |
1 |
|
|
|
|
|
|
2.0 |
1 |
|
|
|
|
|
|
|
2.1 Background |
1 |
|
|
2.2 Site Description |
1 |
|
|
2.3 Construction Programme |
1 |
|
|
2.4 Project Organization and
Management Structure |
1 |
|
|
2.5 Contact Details of Key Personnel |
1 ¡V 2 |
|
|
2.6 Construction Progress in this
reporting month |
2 |
|
3.0 |
|
|
|
|
3.1 EM&A Programme |
2 |
|
|
3.2 Monitoring Stations and
Parameters |
2 |
|
|
3.3 Monitoring Methodology and
Calibration Details |
2 |
|
|
3.4 Environmental Quality
Performance Limits (Action/Limit Levels) |
2 |
|
|
3.5 Environmental Mitigation
Measures |
2 |
|
|
|
|
|
4.0 |
|
|
|
|
4.1 Air Quality |
2 ¡V 3 |
|
|
4.2 Noise |
3 |
|
|
|
|
|
5.0 |
|
|
|
|
5.1 Summary of site inspection findings and
Action(s) taken by Kaden and ET in this quarter |
3 ¡V 5 |
|
|
5.2 Implementation Status of
Environmental Mitigation Measures |
6 |
|
|
5.3 Status of Environmental Licensing
and Permitting |
6 |
|
|
5.4 Advice on Solids and Liquid Waste
Management Status |
6 ¡V 7 |
|
|
|
|
|
6.0 |
Non-compliance of the
environmental quality performance limits |
|
|
|
6.1 Summary of Non-compliance |
7 |
|
|
6.2 Review of the Reasons for and the Implications
of Non-compliance |
7 |
|
|
6.3 Summary of Actions Taken |
7 |
|
|
6.4 Summary of Environmental Complaint,
Notification of Summons and Successful Prosecutions Handling |
7 ¡V
8 |
|
|
|
|
|
7.0 |
8 |
|
|||
|
2005/C1/2004 |
Village Sewerage Layout Plans ¡V Sok Kwu Wan (Sheet 1 of 3) |
|
|
|
2005/C1/2005 |
Village Sewerage Layout Plans ¡V Sok Kwu Wan (Sheet 2 of 3) |
|
|
|
2005/C1/2006 |
Village Sewerage Layout Plans ¡V Sok Kwu Wan (Sheet 3 of 3) |
|
|
|
Tables |
|
||||
|
2.1 |
Contact Details of Key Personnel |
|
|||
|
4.1 |
Summary of Number of Exceedances for 1-hr and 24-hr TSP Monitoring |
|
|||
|
4.2 |
Summary of Impact Monitoring results of Noise Daytime Monitoring |
|
|||
|
5.1 |
Summary
of Site Inspection Findings and Action(s) taken by Kaden and ET |
|
|||
|
5.2 |
Summary of environmental licensing and permit status |
|
|||
|
5.3 |
Offsite Waste
Disposal in this Quarter |
|
|||
|
|
|
|
|||
|
|
|
|
|||
This is the second Quarterly Environmental
Monitoring and Audit (EM&A) Summary Report prepared by ETS-Testconsult Ltd
(ET) for the¡§Contract No. DC/2007/18 Yung Shue Wan and Sok Kwu
Wan Village Sewerage, Stage 1 Works¡¨ (the
Project) under the
requirements and specifications of ¡§the
Environmental Permit (Application No. AEP-281/2007)¡¨ (the EP) and ¡¨the Final EM&A
Manual ¡V Outlying
Islands Sewerage Stage 1 Phase 2 Package J ¡V Sok Kwu Wan Sewage Collection,
Treatment and Disposal Facilities¡¨ (the EM&A Manual).
This report documents the findings of EM&A Works
conducted during the construction phase of the Project from September to November
2008.
Construction
Progress
The major
construction works in this quarter
were as below:
|
September 2008 |
¡P
Installation
of drain pipe ¡P
Construction
of manhole ¡P
Trenchless works |
|
October 2008 |
¡P
Excavation
work for installation of sewer pipe ¡P
Construction of manhole |
|
November 2008 |
¡P
Installation
of sewer pipe ¡P
Construction of manhole |
Environmental
Monitoring Progress
The summary of
the monitoring activities in this quarter is
listed below:
¡P
Noise Monitoring (Day-time): 13 Occasions at 4 designated
locations;
¡P
24-hour TSP Monitoring: 16 Occasions at 3 designated locations;
¡P
1-hour TSP Monitoring: 48 Occasions at 3 designated locations.
Impact
Air Quality Monitoring
No
exceedances of Action and Limit levels were recorded for 24-hr and 1-hr TSP
monitoring in the quarter.
Impact
Noise Monitoring
One exceedance of Action Level was recorded in this
reporting month since one complaint on noise issue was
received on 15 October 2008. The details of the complaint
refer to Section 6.4.
Environmental
Complaints, Notifications of Summons and Successful
Prosecutions
In this quarter, a
complaint received on 17 October 2008 through email by the RE was from the owner of House
14 on 15 October 2008 about noise generated from the concrete pavement breaking
works carried out at the adjacent to the house in the morning of that day. Details of the complaint are presented in Section 6.4.
No
notifications of summons and successful prosecutions were received in this quarter.
Internet Website
This Quarterly EM&A Summary Report can be accessed on the web at http://www.skwsewer.com..
The Customer, Kaden Construction Limited
(Kaden), appointed
Environmental Team of ETS-Testconsult Limited to undertake the environmental impact monitoring for ¡§Contract No. DC/2007/18 Yung Shue Wan and Sok Kwu Wan
Village Sewerage, Stage 1 Works¡¨ (the Project) under the requirements and
specifications of ¡§the Environmental Permit
(Application No. AEP-281/2007)¡¨ (the EP) and ¡¨the
Final EM&A Manual ¡V Outlying
Islands Sewerage Stage 1 Phase 2 Package J ¡V Sok Kwu Wan Sewage Collection,
Treatment and Disposal Facilities¡¨ (the EM&A Manual).
This Quarterly
EM&A Summary Report
documented the findings of EM&A Works conducted during the construction
phase of the
Project in September,
October and November 2008.
2.1
Background
Under this
Project, Kaden is required to construct village sewerage in Yung Shue Wan and
Sok Kwu Wan,
Village sewage
works are undertaken in this Project. These will comprise laying approximately
As the main Contractor of the captioned
project contracted by, Kaden will follow the environmental monitoring
recommendation stated in the EM&A Manual that was prepared
with reference to the EIA Report (Register No.: AEIAR-075/2003).
According to the EP and
the EM&A Manual, the environmental programme is mainly focused on the
construction activities of this Project in Sok Kwu Wan. At the same time, all air
quality and noise monitoring stations proposed in the EM&A Manual are
located in Sok Kwu Wan. The baseline report is prepared in accordance with EP
(No. EP-281/2007) for the Designated Project ¡§Outlying
2.2
Site Description
The general layout plan of the project in Sok Kwu Wan is
shown in Drawing No. 2005/C1/2004,
2005/C1/2005 and 2005/C1/2006.
Surrounding the construction site, there are air and
noise sensitive receivers at
2.3
Construction Programme
The construction programme is shown in Appendix F.
2.4 Project
Organization and Management Structure
The
organization chart with respect to the on-site environmental management and
monitoring program are shown in Appendix A.
2.5
Contact Details of Key Personnel
The key personnel contact names and telephone numbers, and construction programme are shown in table 2.1.
Table 2.1 Contact
Details of Key Personnel
|
Organization |
Project
Role |
Key Staff |
Tel. No. |
Fax No. |
|
Scott Wilson CDM JV |
Engineer Representative |
Ir Ian J Jones |
2982 0240 |
2982 4129 |
|
Scott Wilson CDM JV |
Independent Environmental
Checker |
Mr. Rodney Ip |
2410 3750 |
2428 9922 |
|
Kaden
Construction Ltd |
Contractor |
Ir Stephen Leung |
2454 9102 |
2465 1207 |
|
ETS-Testconsult Ltd |
Environmental Team |
Mr. C L Lau |
2946 7791 |
2695 3944 |
3.0 Summary of EM&A Requirements
3.1
EM&A Programme
In accordance with Section 5 of the EP, EM&A programme
as set out in the EM&A Manual is required to be implemented. In accordance
with the EM&A Manual,
environmental monitoring of air quality and noise are required for the
Project. The EM&A requirement for each parameter are described in details
in subsequent sections, including:
¡P All monitoring parameters;
¡P Action and
Limit levels for all environmental parameters;
¡P Event-Action
Plans;
¡P Environmental
mitigation measures, as recommended in the project EIA study report;
¡P Environmental
requirements in contract documents.
The implementation status of environmental mitigation measures is summarized in Section 5.2 of the Report.
3.2
Monitoring Stations and Parameters
The EM&A Manual designates several locations to monitor
environmental impacts in terms of air quality and noise due to the Project. The
description and detailed locations of monitoring stations for air quality and noise are shown in
Figures 2005/C1/2004, 2005/C1/2005
and 2005/C1/2006 and relevant sections of
this Report.
3.3
Monitoring Methodology and Calibration Details
All monitoring works were conducted and monitoring equipment was calibrated in accordance with the EM&A Manual.
3.4
Environmental Quality Performance Limits
(Action/Limit Levels)
The environmental quality performance limits, i.e. Action/Limit Levels (AL Levels) were derived from the baseline monitoring results. If the measured environmental quality parameters exceed the AL Levels, the respective action plan will be implemented. The AL Levels for each monitoring parameter are given in Appendix D. The event action plan is given in Appendix E.
3.5
Environmental Mitigation Measures
Relevant mitigation measures were recommended in the EM&A
Manual for the Contractor to implement. A list of mitigation measures is given
in Appendix G.
4.1
Air Quality
In accordance with the EM&A Manual, 1-hr and 24-hr TSP air quality monitoring are to be conducted three times and one
time per six days correspondingly. In the reporting quarter, all the 1-hr and
24-hr TSP monitoring results complied with the AL Levels. The monitoring trends of air quality during
the reporting quarter are given in Appendix B2.
Major dust sources in the Project were excavation works and vehicle used for moving sand, aggregates and construction waste.
Table
4.1 presents the number of exceedances recorded in each month of the reporting
quarter.
Table 4.1 Summary of Number of
Exceedances for 1-hr and 24-hr TSP Monitoring
|
Monitoring
Parameter |
Level of Exceedance |
September 2008 |
October 2008 |
November 2008 |
|
24-hr TSP |
No of monitoring events |
5 |
6 |
5 |
|
Action Level |
0 |
0 |
0 |
|
|
Limit Level |
0 |
0 |
0 |
|
|
Total |
0 |
0 |
0 |
|
|
1-hr TSP |
No of monitoring events |
15 |
18 |
15 |
|
Action Level |
0 |
0 |
0 |
|
|
Limit Level |
0 |
0 |
0 |
|
|
Total |
0 |
0 |
0 |
4.2
Noise
Noise monitoring is required to be conducted at least once per week. Only daytime noise was monitored in the reporting quarter. All recorded noise levels complied with the AL Levels. The registered noise levels in the past three months are plotted in Appendix C2.
Table 4.2 presents the number of exceedances recorded in each month of the reporting quarter.
Table 4.2 Summary of Impact Monitoring results of Noise Daytime Monitoring
|
Level of Exceedance |
September 2008 |
October 2008 |
November 2008 |
|
No of monitoring events |
4 |
5 |
4 |
|
Action Level |
0 |
1 |
0 |
|
Limit Level |
0 |
0 |
0 |
|
Total |
0 |
1 |
0 |
The major noise sources in the reporting quarter were excavation works and vehicle used for moving sand, aggregates and construction waste near the site egress.
In this quarter, one exceedance of Action Level was recorded in this reporting month since one complaint on noise issue was received on 15 October 2008. Besides, no exceedances in Limit Level were recorded according to the results from Day-time noise monitoring.
5.1 Summary of site
inspection findings and Action(s) taken by Kaden and ET in this quarter
ET conducted weekly site inspections to monitor the Contractor¡¦s
implementation of environmental mitigation measures. After each site
inspection, the Contractor was notified of ET¡¦s observations and
recommendations and then
the Contractor will arrange related
remedial
works.
Summary of the site inspection findings in this reporting month is
shown in Table 5.1.
Table 5.1 Summary of Site Inspection Findings and Action(s)
taken by Kaden and ET
|
Item |
Aspect |
Finding |
Action(s) to be taken by the Contractor |
ET
Verification |
|
September 2008 |
||||
|
1 |
Air and Site Practice |
Follow up action to the outstanding finding in the previous month, stockpiles of fill materials were found
covered properly at S160. Area 2B and S51 during the weekly site inspection
on |
Since the finding was improved, no further action is required to be
taken by the Contractor. |
Since the finding was improved, no further verification is required to
be taken by ET. |
|
2 |
Air |
During the weekly site inspection on |
The Contractor replied to cover the vehicle with tarpaulin sheet when
leaving the site. |
During the next weekly site inspection, no vehicle was noted leaving
the site without cover and hence no further ET verification was required. |
|
3 |
Water |
Follow up action to the outstanding finding in the previous month, stagnant water was observed accumulated at
S56 near |
The Contractor replied to drain the stagnant water or apply pesticide
to avoid mosquito breeding. |
During the last weekly site inspection on |
|
4 |
Chemical |
Two oil containers were found on the ground at SKW Playground without
drip tray during the weekly site inspection on |
The Contractor replied to collect and store/dispose the containers
properly. |
During the subsequent weekly site inspection on |
|
5 |
Chemical |
Oil leakage was noted from a generator at S56 near Chung Mei Tsuen
during the weekly site inspection on |
The Contractor replied to clean up the contaminated soil as chemical
waste, provide an appropriate drip tray for the generator and stop to use the
defect generator and repair it as soon as possible. |
Since the finding was recorded at the last weekly site inspection, it
will be verified in the coming month. |
|
October 2008 |
||||
|
1 |
Air |
Excavated materials were stockpiled outside the manholes near works
area S39, S167 and S56, and storage area beside S51 during the weekly site
inspection on |
The Contractor replied to cover the excavated materials when not in
use. |
During the subsequent weekly site inspection on |
|
2 |
Air |
Stockpile at S51 was found without cover during the weekly site
inspections on |
The Contractor replied to cover all stockpiles. |
Since the finding was still observed at the last weekly site
inspection, it will be verified in the coming month. |
|
3 |
Water |
Export pipeline at S147 was found leaking during the weekly site
inspection on |
The Contractor replied to repair and maintain all pipeline properly to
avoid any leakage. |
During the subsequent weekly site inspection on |
|
Item |
Aspect |
Finding |
Action(s) to be taken by the Contractor |
ET
Verification |
|
October 2008 |
||||
|
4 |
Chemical |
Follow up action to the outstanding finding in the previous month, oil
stain was cleaned up during weekly site inspection on |
Since the finding was improved, no further action is required to be
taken by the Contractor. |
Since the finding was improved, no further verification is required to
be taken by ET. |
|
5 |
Chemical |
Oil leakage was noted from a defect excavator at storage area W2B during
the weekly site inspection on |
The Contractor replied to repair and maintain all excavators properly
to avoid oil leakage. |
The defect excavator was found removed during the weekly site
inspection |
|
6 |
Chemical |
A generator at S56 was found without drip tray during the weekly site
inspection on |
The Contractor replied to provide drip tray for all generators. |
During the subsequent weekly site inspection on |
|
7 |
Chemical |
Oil stain was noted under a working excavator in front of °K¶é during the weekly site
inspection on |
The Contractor replied to clean up the oil stain and repair the defect
excavator. |
During the subsequent weekly site inspection on |
|
8 |
Chemical |
Two chemical containers were noted at S148 without drip tray during
the weekly site inspection on |
The Contractor replied to provide drip trays for all chemicals. |
During the subsequent weekly site inspection on |
|
November 2008 |
||||
|
1 |
Air |
Follow up action to the
outstanding finding in the previous month, stockpile at S51 was found covered
during the weekly site inspection on |
Since the finding was improved,
no further action is required to be taken by the Contractor. |
Since the finding was improved,
no further verification was required to be taken by ET. |
|
2 |
Water |
Debris and unused materials were
found disposed of in the channel adjacent to the ¡§ |
The Contractor replied to clean
up the debris and unused materials in the channel immediately. |
During the weekly site
inspection on |
|
3 |
Water |
Stagnant water was noted inside
the manhole at S147 and S60 during the weekly site inspection on |
The Contractor replied to apply
insecticide to avoid mosquito breeding. |
During the subsequent weekly
site inspection on |
|
4 |
Chemical |
Some chemical oil tanks at
storage area were found without drip tray and labels during the weekly site inspection
on |
The Contractor replied to
provide drip trays and labels for all chemicals. |
During the next weekly site
inspection on |
|
5 |
Site Practice |
Debris and rubbish were noted at
the coastal area near Chung Mei during weekly site inspection on |
The Contractor replied to
collect the rubbish immediately. |
During the subsequent weekly
site inspection on |
|
6 |
Site Practice |
Four gas cylinders were placed
in the storage area improperly during the site inspection on |
The Contractor replied to store
them in appropriate area properly especially when not in use. |
During the subsequent weekly
site inspection on |
5.2 Implementation
Status of Environmental Mitigation Measures
According to the summary of the weekly site inspections carried
out in this quarter, it
indicated that site practices of the Kaden were
generally undertaken in an environmentally acceptable manner and the overall
site environmental performance was satisfactory.
Excavation
works and vehicle used for moving sand, aggregates and construction waste were the major dust sources in the Project. Generally, the
Contractor implemented adequate dust mitigation measures in this quarter, such as dampening of unpaved areas and fill material
prior to handling or delivery and well maintenance of plant and equipment to avoid black
smoke emission.
Vehicle traffic and
construction activities near the site egress were the major noise sources. The
powered mechanical equipment were generally operated and maintained properly.
5.3
Status of Environmental Licensing and Permitting
The status of licences and permits is
summarized in Table 5.2.
Table 5.2 Summary
of environmental licensing and permit status
|
Description |
Permit No. |
Valid Period |
Section |
|
|
From |
To |
|||
|
Environmental Permit |
EP-281/2007 |
|
End of Project |
Valid |
|
Water Discharge Licence |
EP890/W2/XD026 |
|
|
Valid Discharge of Industrial Trade Effluent arising from Construction Site to communal storm water drain |
|
Notification under APCO |
Application
had been submitted to EPD on 15 April 2008 |
|||
5.4
Advice on Solids and Liquid Waste Management Status
The Contractor usually disposed of
non-inert wastes
such as general refuses and materials segregated to Sok
Kwu Wan Re-fill Transfer Station (SKWRTS).
Table 5.3 summarizes data on offsite waste disposal in this quarter.
Table 5.3 Offsite
Waste Disposal in this Quarter
|
Type of Waste |
Quantity |
Disposal Location |
Cumulative Quantity |
|
|
Inert C&D Materials |
Total Quantity
Generated (tonne) |
83 |
|
405 |
|
Broken Concrete (tonne) |
0 |
N/A |
0 |
|
|
Reused in the Contract
(tonne) |
40 |
For Stockpile / Reuse |
90 |
|
|
Reused in other
Projects (tonne) |
0 |
N/A |
180 |
|
|
Disposal as Public Fill
(tonne) |
42 |
SKWRTS |
| |