TABLE OF CONTENTS                                                                                                             Page

 

Executive SUMMARY

 

1.0

Introduction

1

 

 

 

2.0

Project Information

1

 

 

 

 

2.1 Background

1

 

2.2 Site Description

1

 

2.3 Construction Programme

1

 

2.4 Project Organization and Management Structure

2

 

2.5 Contact Details of Key Personnel

2

 

2.6 Construction Progress in this reporting month

2

3.0

Impact Air Quality Monitoring

 

 

3.1 Monitoring Requirement

2

 

3.2 Monitoring Equipment

2 ¡V 3

 

3.3 Laboratory Measurement / Analysis

3

 

3.4 Monitoring Parameters, Frequency and Duration

4

 

3.5 Monitoring Locations

4

 

3.6 Action and Limit levels

4

 

3.7 Event-Action Plans

4

 

3.8 Results

4 ¡V 5

 

 

 

4.0

Impact Noise Monitoring

 

 

4.1 Monitoring Requirement

5

 

4.2 Monitoring Equipment

5

 

4.3 Monitoring Parameters, Frequency and Duration

6

 

4.4 Monitoring Locations

6

 

4.5 Monitoring Methodology

6 ¡V 7

 

4.6 Action and Limit levels

7

 

4.7 Event-Action Plans

7

 

4.8 Results

7

 

 

 

5.0

Site inspection

 

 

5.1 Summary of the site inspection findings and Action(s) taken by Kaden and ET

8

 

5.2 Recommendations on site inspection findings in Site Inspections of this month

8

 

 

 

6.0

Status of environmental permits

8 ¡V 9

7.0

waste management

9

8.0

Environmental Non-conformance

9

 

8.1 Summary of Air Quality and Noise Monitoring

9

 

8.2 Summary of Environmental Complaints, Notifications of Summons and Successful Prosecutions

9

9.0

implementation status

10

 

9.1 Implementation Status of Environmental Mitigation Measures

10

 

9.2 Implementation Status of Event and Action Plan

10

 

9.3 Implementation Status of Environmental Complaint Handling

10

 

9.4 Implementation Status of Notification of Summons and Prosecution

10

10.0

Conclusion and Discussion

10

 

 

 

11.0

Furture Key issues

 

 

11.1 Upcoming Environmental Monitoring Schedule in coming month

10 ¡V 11

 

11.2 Upcoming Construction Works Schedule in coming month

11

 

11.3 Environmental Issues for the coming month

11

 

 

 

 

 

 


 

 

 

 

APPENDIX

 

A

Organization Chart and Lines of Communication

 

B1

Calibration Certificates for Impact Air Quality Monitoring Equipments

 

B2

Impact Air Quality Monitoring Results

 

B3

Graphical Plots of Impact Air Quality Monitoring Data

 

C1

Calibration Certificates for Impact Noise Monitoring Equipment

 

C2

Impact Noise Monitoring Results

 

C3

Graphical Plots of Impact Noise Monitoring Data

 

D

Event-Action Plans

 

E

Construction Programme

 

F

Summary of Implementation Status of Mitigation Measures during Site Inspection

 

 

 

Figures

 

2005/C1/2004

Village Sewerage Layout Plans ¡V Sok Kwu Wan (Sheet 1 of 3)

 

2005/C1/2005

Village Sewerage Layout Plans ¡V Sok Kwu Wan (Sheet 2 of 3)

 

2005/C1/2006

Village Sewerage Layout Plans ¡V Sok Kwu Wan (Sheet 3 of 3)

 

 

 

 

Tables

 

2.1

Contact Details of Key Personnel

 

3.1

Monitoring Parameters, Duration and Frequency of Impact Air Quality Monitoring

 

3.2

Air Monitoring Stations

 

3.3

Action and Limit Levels for 24-hr TSP and 1-hr TSP

 

3.4

Summary of 1-hr and 24-hr TSP Monitoring Results

 

4.1

Noise Monitoring Equipment

 

4.2

Duration, Frequencies and Parameters of Noise Monitoring

 

4.3

Noise Monitoring Stations

 

4.4

Action and Limit Levels for Noise Monitoring

 

4.5

Summary of Noise Daytime Monitoring Results

 

5.1

Summary of Site Inspection Findings and Action(s) taken by Kaden and ET

 

6.1

Summary of Environmental Licensing and Permit Status

 

7.1

Summary of Quantities of Waste for Disposal in this reporting month

 

8.1

Statistical Summary of Environmental Complaint-log

 

11.1

Proposed Environmental Monitoring Schedule in coming month

 

 

 

 

 

 

 

 


 

Executive SUMMARY

 

The Contractor, Kaden Construction Limited (Kaden), appointed Environmental Team of ETS-Testconsult Limited (ET) to undertake the environmental impact monitoring for ¡§Contract No. DC/2007/18 Yung Shue Wan and Sok Kwu Wan Village Sewerage, Stage 1 Works¡¨ (the Project) under the requirements and specifications of ¡§the Environmental Permit (Application No. AEP-281/2007)¡¨ (the EP) and ¡¨the Final EM&A Manual ¡V Outlying Islands Sewerage Stage 1 Phase 2 Package J ¡V Sok Kwu Wan Sewage Collection, Treatment and Disposal Facilities¡¨ (the EM&A Manual).

 

This Monthly Impact Monitoring Report No.3 has been prepared by the ET of ETS-Testconsult Limited to document the impact monitoring works conducted for the Project in August 2008.

 

 

Construction Progress

 

The major construction works in this monitoring period were as below:

¡P           Site clearance

¡P           Excavation works for laying of sewerage pipe and trenchless

¡P           Pipe laying works

 

Environmental Monitoring Progress

 

The summary of the monitoring activities in this monitoring period is listed below:

¡P           Noise Monitoring (Day-time): 4 Occasions at 4 designated locations;

¡P           24-hour TSP Monitoring: 5 Occasions at 4 designated locations;

¡P           1-hour TSP Monitoring: 15 Occasions at 4 designated locations.

 

Impact Air Quality Monitoring

 

No exceedances of Action and Limit levels were recorded for 24-hr and 1-hr TSP monitoring in the reporting period.

 

Impact Noise Monitoring

 

No exceedances of Action and Limit levels for noise monitoring were recorded in the reporting period.

 

Waste Management

 

According to weekly site inspection, ET found that the Contractor followed the recommended procedures stipulated in the Waste Management Plan (WMP) on handling and disposal of wastes. In this reporting month, 228.61 tonnes Public Fill (e.g. mix soil and rock) and 1.34 tonnes rubbish were generated and disposed to Sok Kwu Wan Re-fill Transfer Station (SKWRTS) properly. Besides, approximate 10 tonnes C&D materials were in stockpile for reused in the Contract and 181 tonnes were reused in other project in this reporting month.

 

Site Inspection

 

Environmental site inspections conducted in this reporting month are presented as follows:

 

Concerned Parties

Dates of Audit / Inspection

ET

07, 12, 18 and 28 August 2008

 

RE / IEC / Kaden / ET

28 August 2008

 

According to the summary of the weekly site inspections carried out in this month, it indicated that site practices of the Kaden were generally undertaken in an environmentally acceptable manner and the overall site environmental performance was satisfactory.

 

Summary of the site inspection findings in this reporting month is shown as below:


 

Item

Aspect

Finding

Action(s) to be taken by the Contractor

ET Verification

1

Air

Stockpiles of fill materials were found covered improperly at S160. Area 2B and S51 during the weekly site inspection on 28/08/08.

The Contractor was reminded to cover all stockpiles by using tarpaulin sheets.

Since the finding was noted during the last weekly site inspection, it will be verified in the coming month.

2

Water

Stagnant water was observed accumulated at S56 near Chung Mei Village during the weekly site inspection on 28/08/08.

The Contractor was reminded to divert the stagnant water to desilting facilities before discharged or apply pesticides to avoid mosquito breeding.

Since the finding was noted during the last weekly site inspection, it will be verified in the coming month.

3

Site Practice

Timber and water pipes at Area 2B and S161 were noted stored improperly during the weekly site inspection on 28/08/08.

The Contractor was reminded to store all construction material properly and keep the site area tidy.

Since the finding was noted during the last weekly site inspection, it will be verified in the coming month.

 

Environmental Complaints, Notifications of Summons and Successful Prosecutions

 

No environmental complaints, notifications of summons and successful prosecutions were received in this reporting period.

 

Conclusion and Recommendations

 

The monitored environmental data indicated that no unacceptable environmental impacts arising from the Project had been caused to the surrounding sensitive receivers. The environmental mitigation measures had been effective in controlling potential impacts to within acceptable sensitive receivers. Besides, the Contractor was recommended to maintain good site practice in order to minimize the environmental impacts at the site.

 

Construction Programme for Coming Month

 

The Construction programme for the Project is shown in Appendix E.

 

As informed by the Contractor, the activities to be conducted by them in coming month included:

¡P           Trench excavation work; and

¡P           Sewer pipe-laying works.

 

Future Key Issues

 

Based on the forecast of engineering works in the coming month, key issues to be considered are as follows:

¡P              Noise and air quality impact due to construction works; and

¡P              Maintain good site practice to minimize environmental impacts at the site.

 

Internet Website

 

The monthly EM&A report can be accessed on the web at http://www.skwsewer.com.

 


 

1.0               INTRODUCTION

 

The Customer, Kaden Construction Limited (Kaden), appointed Environmental Team of ETS-Testconsult Limited to undertake the environmental impact monitoring for ¡§Contract No. DC/2007/18 Yung Shue Wan and Sok Kwu Wan Village Sewerage, Stage 1 Works¡¨ (the Project) under the requirements and specifications of ¡§the Environmental Permit (Application No. AEP-281/2007)¡¨ (the EP) and ¡¨the Final EM&A Manual ¡V Outlying Islands Sewerage Stage 1 Phase 2 Package J ¡V Sok Kwu Wan Sewage Collection, Treatment and Disposal Facilities¡¨ (the EM&A Manual).

 

In accordance with the Section 5 of the EP, EM&A programme as set out in the EM&A Manual is required to be implemented. In accordance with the EM&A manual, environmental monitoring of air quality and noise is required for the Project. The EM&A requirement for each parameter are described in details in subsequent sections, including:

 

¡P   All  monitoring parameters;

¡P   Action and Limit levels for all environmental parameters;

¡P   Event-Action Plans;

¡P   Environmental mitigation measures, as recommended in the project EIA study report;

¡P   Environmental requirements in contract documents.

 

This monthly EM&A report summarizes the impact monitoring in August 2008. This monthly EM&A report can be accessed on the web at http://www.skwsewer.com.

 

 

2.0               PROJECT INFORMATION

 

2.1               Background

 

Under this Project, Kaden is required to construct village sewerage in Yung Shue Wan and Sok Kwu Wan, Lamma Island.

 

Village sewage works will be undertaken in this Project. These will comprise laying approximately 1.4km of sewerage pipes from 220mm to 350mm diameter in Sok Kwu Wan Village. These works will be carried out under a conventional Design, Bid, Build (DBB) contract, entirely separate from the single Design, Build and Operate (DBO) contract for Sewage Treatment Works (STW) construction.

 

As the main Contractor of the captioned project contracted by, Kaden will follow the environmental monitoring recommendation stated in the EM&A Manual that was prepared with reference to the EIA Report (Register No.: AEIAR-075/2003).

 

According to the EP and the EM&A Manual, the environmental programme is mainly focused on the construction activities of this Project in Sok Kwu Wan. At the same time, all air quality and noise monitoring stations proposed in the EM&A Manual are located in Sok Kwu Wan. The baseline report is prepared in accordance with EP (No. EP-281/2007) for the Designated Project ¡§Outlying Islands Sewerage Stage 1 Phase 2 ¡V Sok Kwu Wan Sewage Collection, Treatment and Disposal Facilities¡¨ and the EM&A Manual.

 

2.2               Site Description

 

The general layout plan of the project in Sok Kwu Wan is shown in Drawing No. 2005/C1/2004, 2005/C1/2005 and 2005/C1/2006.

 

Surrounding the construction site, there are air and noise sensitive receivers at Chung Mei Village, Sok Kwu Wan and Ta Shui Wan.

 

2.3               Construction Programme

 

The construction programme is shown in Appendix E.


 

2.4        Project Organization and Management Structure

 

The organization chart with respect to the on-site environmental management and monitoring program are shown in Appendix A.

 

2.5               Contact Details of Key Personnel

 

The key personnel contact names and telephone numbers, and construction programme are shown in table 2.1.

 

Table 2.1            Contact Details of Key Personnel

Organization

Project Role

Key Staff

Tel. No.

Fax No.

Scott Wilson CDM JV

Engineer Representative

Ir Ian J Jones

2982 0240

2982 4129

Scott Wilson CDM JV

Independent Environmental Checker

Mr. Rodney Ip

2410 3750

2428 9922

Kaden Construction Ltd

Contractor

Ir Stephen Leung

2454 9102

2465 1207

ETS-Testconsult Ltd

Environmental Team

Mr. C L Lau

2946 7791

2695 3944

 

2.6       Construction Progress in this reporting month

 

A summary of the major construction activities undertaken in this monitoring month were:

 

¡P          Site clearance

¡P          Excavation works for laying of sewerage pipe and trenchless

¡P          Pipe laying works

 

 

3.0        Impact Air Quality MONITORING

 

3.1       Monitoring Requirement

 

Both 1-hr and 24-hr TSP monitoring is required to be conducted in order to monitor the air quality of the environment during the construction period. For regular monitoring, a sampling frequency of at least one in every six days should be carried out at all designated monitoring stations.

 

3.2        Monitoring Equipment

 

24-hour TSP Monitoring

 

High volume sampler, as HVS, (Greasby GMWS2310) complete with appropriate sampling inlets are employed for 24-hour TSP.  The sampler is composed of a motor, a filter holder, a flow controller and a sampling inlet and its performance specification complies with that required by USEPA standard Title 40, Code of Federation Regulations Chapter 1 (Part 50).

 

Installation

The installation of HVS refers to the requirement stated in EM&A Manual.

 

Operation/Analytical Procedures

Operating/analytical procedures for the operation of HVS are as below:

 

Prior to the commencement of the air sampling, the flow rate of the high volume sampler was properly set (between 0.6m3/min and 1.7m3/min.) in accordance with the manufacturer¡¦s instruction to within the range recommended in USEPA Standard Title 40, CFR Part 50.

 

¡P       For TSP sampling, fiberglass filters (GA-55) were used.

¡P       The power supply was checked to ensure the sampler worked properly.

¡P       On sampling, the sampler was operated 5 minutes to establish thermal equilibrium before placing any filter media at designated air monitoring station.

¡P       The filter holding frame was then removed by loosening the four nuts and carefully a weighted and conditioned filter was centered with the stamped number upwards, on a supporting screen.


 

¡P       The filter was aligned on the screen so that the gasket formed an air-tight seal on the outer edges of the filter.  Then the filter holder frame was tightened to the filter holder with swing bolts.  The applied pressure should be sufficient to avoid air leakage at the edges.

¡P       The programmable timer will be set for a sampling period of 24 hours.  Information was recorded on the record sheet, which included the starting time, the weather condition and the filter number (the initial weight of the filter paper can be found out by using the filter number.).

¡P       After sampling, the filter was transferred from the filter holder of the HVS to a sealed plastic bag and sent to the laboratory for weighting.  The elapsed time was also recoded.

¡P       Before weighting, all filters were equilibrated in a desiccator for 24 hour with the temperature of 25oC + 3oC and the relative humidity (RH) <50% +5%.

 

Maintenance & Calibration

¡P       The HVS and their accessories were maintained in good working condition, such as replacing motor brushes routinely and checking electrical wiring to ensure a continuous power supply.

¡P       The HVSs used were calibrated before the commencement of air quality monitoring, after maintenance and every two months. Five-point calibration by using calibration kit (e.g. Tisch TE-5025A) was performed to establish a relationship between the flow recorder meter reading in cfm (cubic feet per minute) and the standard flow rate, QStd, in m3/min.

 

1-hour TSP Monitoring

 

1-hour TSP levels were measured by using 1-hour dust meter which are capable of producing comparable results as the by high volume sampling method, to indicate short event impacts.

 

Measuring Procedures

The measuring procedures of the 1-hr dust meter are in accordance with the Manufacturer¡¦s instruction Manual as follows:

 

¡P       Set POWER to ON, check the battery indicator to ensure whether the power supply is enough to conduct the TSP monitoring;

¡P       Calibrate the dust meter by zero check;

¡P       Set the time constant of the dust meter;

¡P       Press sample to start the TSP monitoring;

¡P       Record the maximum, minimum and average reading directly from the dust meter by press Statistics when monitoring complete.

 

Maintenance & Calibration

¡P       1-hour dust meter should be checked at 6-month intervals throughout all stages of impact air quality monitoring. Through a five-point calibration by placing the dust meter and calibrated HVS under the same environmental condition, a relationship in TSP level (mg/m3) between dust meter and HVS was established.

 

3.3       Laboratory Measurement / Analysis

 

Environmental Laboratory of ETS-Testconsult which is HOKLAS accredited, carried out the laboratory analysis.

 

A clean filter paper with no pinholes was used for each time of monitoring. Before sampling, the filter paper of size 8¡¨ x 10¡¨ was labelled and conditioned in a humidity controlled chamber for over 24 hours and pre-weighed before use for the sampling.

 

After sampling, the filter paper loaded with dust was kept in a clean and tightly sealed plastic bag. The filter paper then returned to the laboratory for reconditioning in the humidity controlled chamber following by accurate weighing by an electronic balance with readout down to 0.1mg. The balance was calibrated against a traceable standard.

 

All the analysis results and collected samples were kept in a good condition for 6 months after completion of the monitoring exercise before disposal.


 

3.4        Monitoring Parameters, Frequency and Duration

 

           Table 3.1 summarizes the monitoring parameters, monitoring duration and frequencies of impact air quality monitoring.

 

            Table 3.1        Monitoring parameters, duration and frequencies of impact air quality monitoring

Parameter

Duration

Frequency

24-hr TSP

24 hr (0000-2400)

One in every six days

1-hr TSP

1 hr (0700-1900)

3 times per day in every six days

 

3.5        Monitoring Locations

 

As the requirement in the EM&A Manual, three designated air monitoring stations were selected. Table 3.2 tabulates the air quality monitoring locations of this Project.

 

            Table 3.2        Air monitoring stations

Air monitoring station

Description of location

AM1

Squatter house in Chung Mei Village

AM2

Squatter house in Chung Mei Village

AM3

Football Court

 

3.6        Action and Limit Levels

 

Action and Limit levels for 24-hr TSP and 1-hr TSP derived as illustrated in Table 3.3.

 

Table 3.3        Action and Limit levels for 24-hr TSP and 1-hr TSP

Monitoring Station

24-hr TSP (mg/m3)

1-hr TSP (mg/m3)

Action Level

Limit Level

Action Level

Limit Level

AM1

173

260

343

500

AM2

175

260

331

500

AM3

191

260

353

500

 

3.7        Event-Action Plans

 

Should the results of the monitoring parameters at any designated monitoring stations indicate that the air quality criteria are exceeded, the actions in accordance with the Event and Action Plan that summarized in Appendix D should be carried out.

 

3.8        Results

 

Totally 5 occasions of 24-hr TSP monitoring and 15 occasions of 1-hr TSP monitoring were carried out in this reporting period. All monitoring data of 1-hr and 24-hr TSP monitoring is provided in Appendix B2. Graphical presentation of both 1-hr and 24-hr TSP monitoring results for the reporting month is shown in Appendix B3.

 

24-hr and 1-hr TSP monitoring on 06/08/08 were cancelled due to bad weather (Typhoon Signal No.8) and rescheduled on 07/08/08. Besides, dust monitoring on 22/08/08 was also cancelled due to bad weather (Typhoon Signal No.9) and rescheduled on 25/08/08.

 

No exceedances of Action and Limit Level of 1-hr and 24-hr TSP monitoring results were recorded during the reporting month. Table 3.4 summaries the 1-hr and 24-hr TSP monitoring results.

 


 

Table 3.4           Summary of 1-hr and 24-hr TSP Monitoring Results

Parameter

1-hr TSP Monitoring

Station

AM1

AM2

AM3

Date

Time

Result

Exceed*

Time

Result

Exceed*

Time

Result

Exceed*

07/08/08

09:15

153

X

13:00

162

X

09:30

139

X

07/08/08

10:15

147

X

14:00

152

X

10:30

150

X

07/08/08

11:15

136

X

15:00

156

X

11:30

147

X

12/08/08

13:00

97

X

09:20

110

X

09:10

115

X

12/08/08

14:00

113

X

10:20

98

X

10:10

128

X

12/08/08

15:00

109

X

11:20

94

X

11:10

110

X

18/08/08

08:50

85

X

09:00

95

X

13:10

142

X

18/08/08

09:50

93

X

10:00

103

X

14:10

151

X

18/08/08

10:50

104

X

11:00

110

X

15:10

149

X

25/08/08

08:50

104

X

09:00

111

X

13:10

165

X

25/08/08